亚洲视频福利,亚洲丶国产丶欧美一区二区三区,H漫无羞遮无删减漫画免费,需要影音先锋下载的AV,国产日本一区二区精品,亚洲黄图

首頁
產(chǎn)品
卓越 ? 易用 ? 可靠
視頻
讓中國物聯(lián)網(wǎng)領(lǐng)先世界
搜索
歷史搜索
搜索發(fā)現(xiàn)
HOME > SERVICE > Problem

AC0606 voltage and current calibration

2022-06-11 15:49:35| Source:網(wǎng)絡(luò)| views:| 0

1. The power supply of the equipment is normal, the measured current passes through the transformer coil, and the municipal power is connected to the voltage acquisition port. 

2. The current is preferably about 80% of the measuring range of the transformer coil, and the load to be measured can also be used for calibration. 

3. After the equipment communication is connected, open the modbus poll project for calibration.

  

modbus poll工程進(jìn)行校準(zhǔn)


  

modbus poll工程進(jìn)行校準(zhǔn) 數(shù)據(jù)顯示

4. Use the instrument to measure the voltage of the voltage acquisition port and the current through the transformer, and fill in the [standard source] project. 

4. After filling in the standard source, wait for 5S after filling in the calibration mode [171], observe whether the values of each voltage, current and power channel are correct, and if correct, the calibration is completed.

修改后觀察電流、電壓、頻率等內(nèi)容

5. After the equipment is powered on again, adjust the current to observe the linearity of the equipment, if the power factor is less than 0.5 or negative reverse connection transformer.


聯(lián)系銷售
銷售王經(jīng)理微信 銷售王經(jīng)理
微信公眾號 微信公眾號
服務(wù)熱線
400-6688-400
阿城市| 都匀市| 兴宁市| 安顺市| 元氏县| 满洲里市| 乌拉特中旗| 栾川县| 大安市| 车致| 巨鹿县| 西峡县| 会东县| 泗阳县| 寿阳县| 宕昌县| 平潭县| 闸北区|